Home : Remediation
The Pottersburg PCB Storage Site Cleanup project involves the removal of approximately 78,000 tonnes of contaminated material from the storage location. To learn more about this project visit the official Pottersburg Project website.
"Nationally recognized as a leader in the clean-up and rehabilitation of commercial and industrial sites and facilities, Quantum Murray (QMLP) has assembled an outstanding team of professional engineers and experts specializing in environmental remediation and site decontamination."
Quantum Murray LP
Drawing on our extensive civil and geotechnical construction background, we provide a full range of remediation services, from heavy civil and geotechnical applications, to industrial site decommissioning, site excavation and remediation, treatment of contaminated soil and water, all manner of cut-off walls (clay, soil bentonite admixtures, Waterloo barrier, bentonite slurry walls, bentomat, concrete caisson walls), excavation shoring (shot-crete with anchors, H-Pile and lagging, caisson wall), slurry excavation, UST/AST removal, and in-situ system installation.
We work closely with our clients and their consultants to identify the scope and nature of the contamination and then develop a comprehensive plan for remediation. Each site or facility is carefully reviewed to determine the most effective method for ensuring that it is safely restored and meets all regulatory conditions.
We are continuously exploring new remediation technologies and innovative processes so that we are able to provide our clients with the latest advancements in the area of environmental remediation. Each phase is carefully documented to minimize the risk to the environment, both today and over the long term.
To submit soil for treatment, please complete QMLP's Soil Characterization Form.
Train Derailment - Bunker C and Pole Treatment Oil - Click the image for a full profile. |
Site Demolition and Remediation - Click the image for a full profile. |
Plant Site Remediation - Click the image for a full profile. |
In-situ Remediation System Installation - Click the image for a full profile. |
Farm Site Decommission and Demolition - Click the image for a full profile. |
Barrier Wall and LNAPL Collection System Installation - Click the image for a full profile. |
Contaminated Soil Management - Click the image for a full profile. |
Rail Siding Site Excavations and Water Treatment - Click the image for a full profile. |
Remedial Excavation and Backfill - - Click the image for a full profile. |
Risk Management Plan Implementation - Click the image for a full profile. |
Excavation, Shoring and Soil Disposal - Click the image for a full profile. |
Closure, Slope Stability and Remediation - Click the image for a full profile. |
Engineered Barrier Wall Installation and Site Remedation - Click the image for a full profile. |
Soil Remediation and Abandoned Office Demolition - Click the image for a full profile. |
Ash Lagoon Remediation - Click the image for a full profile. |
Pottersburg Creek - PCB Remedation - Click the image for a full profile. |
LeBreton Flats - Site Excavation, Sorting and Disposal - Click the image for a full profile. |
Toronto Plant - Install AST and Remove UST - Click the image for a full profile. |
Ottawa Remedation - Interior and Exterior Excavation - Click the image for a full profile. |
Multiple Locations - Removal of USTs - Click the image for a full profile. |
UST Removal and Replacement - Click the image for a full profile. |